Most projects take 1β2 days depending on lawn size and the amount of soil work required.
Sod provides instant results and erosion control and is locally grown with delivery options. Seed is more economical and performs extremely well with proper watering and soil prep. We help you decide based on space, timeline, season, and budget.
Yes β we correct low areas, shape slopes, and adjust grading to improve water flow and reduce standing water.
We use high-quality fescue blends selected specifically for Kentucky lawns and site conditions.
Sod: Usually after 2β3 weeks once roots have established. Seed: Typically 3β5 weeks depending on season and growth rate.
Seeding is best from September through mid-October, or MarchβApril if necessary. (We do not recommend Spring full-kill seeding.) Sod can be installed March through December.
Yes β we provide detailed watering information to ensure successful establishment.
Follow us on Instagram to see everything from fresh installs to seasonal maintenance, and get a behind-the-scenes look at life on the job with Perfect Earth Landscape.Β